Afternoon,
Ive been tasked with setting up a scheduling method using syspro for our company.
im 99% there, and use excel our our schedule "viewer" rather than the Preactor software which is overkill for us.
I generate a report that lists every operation, and its planned completion date for that operation, in a big long list.
My issue is when the same operation goes in twice. Ie, you fabricate an item, then machine it, then do final fabrication. It does not allow me to link the operation number, to the date. The furthest i can drill down is Job then work centre.
Job Status is my base report.
WipLabAll is my subreport, that i pull the PlannedEndDate from.
I link the Planned End Date to the Job, then the work centre, but due to work centres being used more than once, i need it to link to the operation number, to pick the right date.
SO basically im in a situation where my report pulls ALL dates from the sub report, any times the work centre is displayed, because it wont let me be any more specific in my linking (even though this Op# field can be placed in both main report and sub report, it has no field linking ability)
Any help much much appreciated.
(Pictures to explain on Onedrive below)
https://1drv.ms/f/s!Aghb6j8ujH_Uget4unhXE1Z14GPHbg